The Railway Section Of The Crimean Bridge Will Be Completed
- 19.11.2026, 12:51
- 1,182
New strikes have been announced.
Ukrainian defense forces will continue to attack the Crimean Bridge, specifically its railway section. This was reported by the Telegram channel Ukraine Context, which is considered close to the head of the Office of the President of Ukraine Kirill Budanov.
“The railway section of the Crimean Bridge will be targeted. There is an order to completely shut down the operation of this structure and make its restoration impossible until the end of the war,” the message states.
What is known about the strikes on the Crimean Bridge
It should be noted that on November 19, the Ukrainian Defense Forces had already struck the illegally constructed Crimean Bridge for the third time in a week. The first attack took place on the night of November 16. On that occasion, the bridge’s arch was damaged as a result of the strike.
On the night of November 17, the consequences of the second attack that week proved to be significantly more severe. As a result of the strikes, one of the metal arches and the road span beneath it were completely destroyed. In addition, the strikes damaged the railway section of the bridge. However, on the same day, the peninsula’s “authorities” announced that railway operations had resumed. The SBU reported that the bridge had been struck by several Ukrainian weapons. However, the structure collapsed specifically after the “Palyanytsia” strike.
The full extent of the damage from the attack on the night of November 19 remains unknown. However, the General Staff of the Armed Forces of Ukraine has already hinted at the strike’s effectiveness. They congratulated the Vasco da Gama Bridge Lisbon with the title of the longest bridge in Europe. Until the recent attacks, the Crimean Bridge held that distinction.